After architectural project is completed, proper maintenance extends the lifespan and preserves performance. Here are the maintenance tips to follow.
Keep the Project Archive
Keeping approved drawings, the permit and as-built files digitally and in print is needed for future renovation and sale.
As-Built Update
Changes made during construction must be recorded on the project; outdated drawings cause errors in later work.
Occupancy and Permit Follow-up
When the building is complete, the occupancy permit should be obtained and documents filed completely.
Consult the Architect for Changes
If future changes affect the structure or facade, the architect must always be consulted.
Conclusion